School project san jose de clunny
Final work carried out at the end of the cycle; the building has two floors and has the textures according to the real building. with cut and elevations.
- Format RVT
- File Size 8.66 MB
- Company
Final work carried out at the end of the cycle; the building has two floors and has the textures according to the real building. with cut and elevations.